spacer

Home Page > Welcome to our website
 

Environmental Policy

Protect and respect the environment is part of our deep interest and our desire to preserve and improve the quality of life for present and future generations futues.

Environmental Policy
CHOTRANA 2


Quality management
of ONAS tenders announcements

 
Wastewater treatment plant status

Learn more

The sanitation projects included in the development plan

The sanitation projects included in the development plan

Learn more

PRESENTATION

ONAS (The National Sanitation Utility) is a public entity of an industrial and commercial character. It was established in 1974 and entrusted with the management of the sanitation sector (sewerage network).
Learn more

Publications
Internal audit charter (Arabic version)

Download our Internal audit charter (Arabic version)
PAQEE-II Project - Lot 1: Environmental and Social Compliance Audit

Download our PAQEE-II Project - Lot 1: Environmental and Social Compliance Audit
2024 Activity Report (French version)

Download our 2024 Activity Report (French version)
Survey

What do you prefer in our website?

Quality of content
Sanitation News


The graphics
NEWS

09-07-2026 | The visit of the Japanese Ambassador

Read more

20-02-2025 | Field visit of a delegation from the African Development Bank to the Khalidia purification station.
As part of the Small Cities Sanitation Program (Phase 1),
Read more

Close [X]

As part of the Small Cities Sanitation Program (Phase 1), funded by the African Development Bank (ADB) and the European Bank for Reconstruction and Development (EBRD), a delegation from the AfDB's Water and Sanitation Department conducted a site visit to the Khalidia wastewater treatment plant on Friday, February 7, 2025, at 10:00 AM.

The purpose of this visit was to assess the progress of the plant's construction and to examine the technical methodologies employed in its development.

 

 

07-07-2026 | Programme de coopération technique et financière entre la République du Mali et la Banque allemande de développement (KfW)

Read more

10-05-2025 | Energy Efficiency Program
On Saturday, May 10, 2025, a delegation of donor representatives visited the wastewater treatment plant project in M'saken (Sousse Governorate) to review progress on its renovation and expansion.
Read more

Close [X]

On Saturday, May 10, 2025, a delegation of donor representatives visited the wastewater treatment plant project in M'saken (Sousse Governorate) to review progress on its renovation and expansion.

By the end of this year, the plant’s capacity will more than double—from 8,000 to 17,350 cubic meters per day! Co-financed by the German Development Bank (KfW) and the Republic of Tunisia, this project is part of the national Energy Efficiency Program.

It aims to modernize the plant and integrate energy-saving solutions to improve the quality of treated water and ensure sustainable water resource management.

Total investment: 39 million TND Let me know if you want a version in a more casual tone or with hashtags.


Programme de maîtrise de l'énergie

20-05-2025 | Progress in sanitation for small towns !
Progress in sanitation for small towns! On Thursday, May 8, 2025, a field visit was organized as part of the Small Towns Sanitation Program (targeting towns with fewer than 10,000 residents), with the participation of key donors: the African Development Bank (AfDB
Read more

Close [X]

Progress in sanitation for small towns! On Thursday, May 8, 2025, a field visit was organized as part of the Small Towns Sanitation Program (targeting towns with fewer than 10,000 residents), with the participation of key donors: the African Development Bank (AfDB), the European Bank for Reconstruction and Development (EBRD), and the Republic of Tunisia. 

Project components include: Installation of 56 km of sewer pipes Construction of 2 pumping stations Connection of approximately 2,350 households (Total cost: 17 million TND) Additionally, a wastewater treatment plant using extended aeration will be built, with a capacity of 2,000 m³/day, including a tertiary treatment unit and a system for reusing treated water. 

(Cost: 27 million TND) The project is expected to be completed by June 2026 and aims to significantly improve health and environmental conditions in both localities. Together, we are investing in cleaner, healthier communities.


Progrès en assainissement dans les petites villes

28-10-2025 | WASTEWATER SANITATION STUDY FOR MENZEL M’HIRI AND NASRALLAH IN THE KAIROUAN GOVERNORATE - Environmental and Social Impact Assessment (ESIA) (in French)
As part of the Sanitation Program for Small Municipalities with fewer than 10,000 inhabitants – Phase I, and in accordance with the guidelines of the African Development Bank, and following the approval of the Environmental and Social Impact Assessment (ESIA) for Menzel Mhiri & Nassrallah by the AfDB and the ANPE.
Read more

16-01-2026 | As part of the Small Towns Sanitation Program for municipalities with fewer than 10,000 inhabitants – Phase I, the Environmental and Social Impact Studies (ESIA) of the municipality of Bir Ali Ben Khalifa (Sfax Governorate) were approved by the African Development Bank (AfDB) and the National Agency for Environmental Protection (ANPE)

Read more

30-05-2023 | بلاغ نشر نتائج الإنتقاء الأوّلي لخطّة متصرّف

Read more

Close [X]

يعلم الديوان الوطني للتطهير كافّة المترشحين لمناظرة الانتداب الخارجية عدد 01/2017 في خطّة متصرّف أنّه بإمكانهم الاطّلاع على النتائج الأوّلية الخاصّة بمرحلة الانتقاء الأوّلي عبر موقع واب الديوان www.onas.nat.tn بداية من يوم 30 ماي 2023.

كما يعلم الديوان الوطني للتطهير أنّه بإمكان كلّ مترشّح تقديم مطلب اعتراض حول نتيجته في أجل أقصاه يوم 09 جوان 2023 وذلك عبر مراسلة موجّهة إلى السيد الرئيس المدير العام للديوان الوطني للتطهير، يتمّ إرسالها عبر البريد السريع أو إيداعها مباشرة بمكتب الضبط المركزي للديوان الوطني للتطهير على العنوان التالي:

المقرّ الاجتماعي للديوان الوطني للتطهير، 32 شارع الهادي نويرة – 1001-تونس

وتجدر الإشارة إلى أنّه على المترشّح إدخال البيانات الخاصّة به (رقم بطاقة التعريف وكلمة العبور) لمتابعة ترشّحه عبر موقع واب الديوان والاطلاع على النتيجة التي تخصّه. وفي صورة نسيان كلمة العبور لمتابعة الترشّح، يمكن للمترشّح استرجاع كلمة العبور وإدخال بياناته الخاصّة (رقم بطاقة التعريف ورقم البصمة).

أمّا إذا تمّ تجديد بطاقة التعريف الوطنية فيمكن للمترشح مراسلة الديوان لطلب الحصول على رقم البصمة الذي تمّ إدخاله عند التسجيل وذلك عبر البريد الإلكتروني على العنوان التالي:

onas.recrutement@onas.nat.tn

ملاحظات:

- يتمّ اعتماد تاريخ ختم مكتب الضبط المركزي بالنسبة لمطالب الاعتراض الواردة على الديوان مباشرة وختم البريد بالنسبة للمطالب الواردة عبر البريد السريع ولا يتمّ اعتبار المطالب الواردة بعد التاريخ المحدّد أعلاه.

- بعد دراسة مطالب الاعتراض الواردة في الأجل يتمّ تحديد القائمة النهائية للمترشّحين الذين سيتمّ دعوتهم لإجراء الاختبارات الكتابية والشفاهية بواسطة مكاتيب فردية.

30-05-2023 | بلاغ نشر نتائج الإنتقاء الأوّلي لخطّة مهندس مساعد

Read more

Close [X]

يعلم الديوان الوطني للتطهير كافّة المترشحين لمناظرة الانتداب الخارجية عدد 01/2017 في خطّة مهندس مساعد في اختصاص تقنيات المنظومات الإعلامية والشبكات والاتصالات واختصاص آلية وإعلامية صناعية، أنّه بإمكانهم الاطّلاع على النتائج الأوّلية الخاصّة بمرحلة الانتقاء الأوّلي عبر موقع واب الديوان www.onas.nat.tn بداية من يوم 30 ماي 2023.

كما يعلم الديوان الوطني للتطهير أنّه بإمكان كلّ مترشّح تقديم مطلب اعتراض حول نتيجته في أجل أقصاه يوم 09 جوان 2023 وذلك عبر مراسلة موجّهة إلى السيد الرئيس المدير العام للديوان الوطني للتطهير، يتمّ إرسالها عبر البريد السريع أو إيداعها مباشرة بمكتب الضبط المركزي للديوان الوطني للتطهير على العنوان التالي:

المقرّ الاجتماعي للديوان الوطني للتطهير، 32 شارع الهادي نويرة – 1001-تونس

وتجدر الإشارة إلى أنّه على المترشّح إدخال البيانات الخاصّة به (رقم بطاقة التعريف وكلمة العبور) لمتابعة ترشّحه عبر موقع واب الديوان والاطلاع على النتيجة التي تخصّه. وفي صورة نسيان كلمة العبور لمتابعة الترشّح، يمكن للمترشّح استرجاع كلمة العبور وإدخال بياناته الخاصّة (رقم بطاقة التعريف ورقم البصمة).

أمّا إذا تمّ تجديد بطاقة التعريف الوطنية فيمكن للمترشح مراسلة الديوان لطلب الحصول على رقم البصمة الذي تمّ إدخاله عند التسجيل وذلك عبر البريد الإلكتروني على العنوان التالي:

onas.recrutement@onas.nat.tn

ملاحظات:

- يتمّ اعتماد تاريخ ختم مكتب الضبط المركزي بالنسبة لمطالب الاعتراض الواردة على الديوان مباشرة وختم البريد بالنسبة للمطالب الواردة عبر البريد السريع ولا يتمّ اعتبار المطالب الواردة بعد التاريخ المحدّد أعلاه.

- بعد دراسة مطالب الاعتراض الواردة في الأجل يتمّ تحديد القائمة النهائية للمترشّحين الذين سيتمّ دعوتهم لإجراء الاختبارات الكتابية والشفاهية بواسطة مكاتيب فردية.

16-02-2024 | A loan and guarantee had been signed between the Republic of Tunisia and the African development (ADB)

On 31 January 2024 and at the Ministry of Economy and Planning a loan and guarantee had been signed between the Republic of Tunisia and the African development (ADB) in Tunisia concerning the project of improving the quality of treated wastewater to support resilience climatic change .


Read more

Close [X]

On 31 January 2024 and at the Ministry of Economy and Planning a loan and guarantee had been signed between the Republic of Tunisia and the African development (ADB) in Tunisia concerning the project of improving the quality of treated wastewater to support resilience climatic change .

The Agreement signature has been attended by Mrs Leila chikhaoui mahdaoui Minister of Environment , Mrs feriel wirghi Minister of Economy and Planning, Mme maline Bloomberg ADB director of the regional office in Tunisia and Mr Abd Majid bettaib ONAS Chief Executive officer .

The loan comprises 81.9 m euro is around 276 MTD ,the completion of the project is during the period 2024-2028.

This project is part of the government's strategies aimed at achieving the sustainable development goals for the year 2030 and fulfilling international pledges through the specific national contribution (NDC) which emerged from the Paris Climate Agreement and as an embodiment of the major directions of the Development Plan 2023-2025.

This project will contribute to enhance the efficiency of WWT Plants and energy control through the renewal of electromechanical equipments as well as the use of solar photovoltaic energy in 19 WWT Plants distributed in 11 states (nabeul,zaghouan, jendouba,beja,Kasserine,,sidibouzid,sfax,gafsa,tozeur,kebeli and mednine) and improving the living conditions of more than 670.000 inhabitants through the reuse of treated wastewater due to the tertiary treatment of wastewater.

It will also contribute to the production of treated wastewater conforming to the Tunisian standards (NT 106-03) and its reuse in the agricultural field, where will benefit more than 3.000 hectares of agricultural land near the concerned WWT Plants. Moreover, it is expected to create 250 direct jobs and 1000 jobs indirectly as well as the reinforcement of ONAS technical and administrative .

16-02-2024 | Dinner debate on “the development of the sanitation sector and the Reuse of treated wastewater: challenges, perspectives and funding”.
On the sidelines of the 5th Mediterranean water forum, The National Sanitation Utility (ONAS) has organised on February 6th, 2024 a dinner debate on “the development of the sanitation sector and the Reuse of treated wastewater: challenges, perspectives and funding”.
Read more

Close [X]

on the sidelines of the 5th Mediterranean water forum, The National Sanitation Utility (ONAS) has organised on February 6th, 2024 a dinner debate on “the development of the sanitation sector and the Reuse of treated wastewater: challenges, perspectives and funding”.

This event was honored by the presence of Mrs. Leila Chikhaoui Mahdaoui, Minister of Environment and also in attendance were Mr Ridha Gabouj secretary of state for water at the Ministry of Agriculture Water Resources and Fisheries , Mr samir abdelhafid secretary of state at the Ministry of Economy and Planning in charge of small and medium enterprises and Mr Abdelmajid bettaib the Chief Executive Excutive Officer of the National Sanitation Utility (ONAS) , President of IME and the UPM deputy secretary general with the participation of technical and financial partners as well as water experts.

Three major themes were discussed:

1) The reuse of treated wastewater (TWW)

- What are the main obstacles to the development of reuse?

- What role should ONAS play in the light of climate change?

- What measures can be taken to create a framework conducive to the significant development of reuse?

2) Public-private partnerships (PPP)

- What contribution can PPP make to the sector?

- What forms of partnership should be favoured in the context of the sector?

- What kind of partnership with the private sector is appropriate for small municipalities?

- What measures can be taken to improve the feasibility, attractiveness and viability of projects?

- What are the financial implications of partnerships with the private sector in the sanitation sector?

* For investments
* For operation

3) Sanitation in small towns

- Is ONAS's current model adapted to small communes? Is it viable? What impact will this have on ONAS's financial balance?

- How should ONAS position itself in the sanitation of small communes? What is the current state of local governance of sanitation? What role for municipalities?

- What are the technical alternatives for sanitation in small towns?

30-05-2023 | بلاغ نشر نتائج الإنتقاء الأوّلي لخطّة مهندس أوّل

Read more

Close [X]

يعلم الديوان الوطني للتطهير كافّة المترشحين لمناظرة الانتداب الخارجية عدد 01/2017 في خطّة مهندس أوّل أنّه بإمكانهم الاطّلاع على النتائج الأوّلية الخاصّة بمرحلة الانتقاء الأوّلي عبر موقع واب الديوان www.onas.nat.tn بداية من يوم 30 ماي 2023.

كما يعلم الديوان الوطني للتطهير أنّه بإمكان كلّ مترشّح تقديم مطلب اعتراض حول نتيجته في أجل أقصاه يوم 09 جوان 2023 وذلك عبر مراسلة موجّهة إلى السيد الرئيس المدير العام للديوان الوطني للتطهير، يتمّ إرسالها عبر البريد السريع أو إيداعها مباشرة بمكتب الضبط المركزي للديوان الوطني للتطهير على العنوان التالي:

المقرّ الاجتماعي للديوان الوطني للتطهير، 32 شارع الهادي نويرة – 1001-تونس

وتجدر الإشارة إلى أنّه على المترشّح إدخال البيانات الخاصّة به (رقم بطاقة التعريف وكلمة العبور) لمتابعة ترشّحه عبر موقع واب الديوان والاطلاع على النتيجة التي تخصّه. وفي صورة نسيان كلمة العبور لمتابعة الترشّح، يمكن للمترشّح استرجاع كلمة العبور وإدخال بياناته الخاصّة (رقم بطاقة التعريف ورقم البصمة).

أمّا إذا تمّ تجديد بطاقة التعريف الوطنية فيمكن للمترشح مراسلة الديوان لطلب الحصول على رقم البصمة الذي تمّ إدخاله عند التسجيل وذلك عبر البريد الإلكتروني على العنوان التالي:

onas.recrutement@onas.nat.tn

ملاحظات:

- يتمّ اعتماد تاريخ ختم مكتب الضبط المركزي بالنسبة لمطالب الاعتراض الواردة على الديوان مباشرة وختم البريد بالنسبة للمطالب الواردة عبر البريد السريع ولا يتمّ اعتبار المطالب الواردة بعد التاريخ المحدّد أعلاه.

- بعد دراسة مطالب الاعتراض الواردة في الأجل يتمّ تحديد القائمة النهائية للمترشّحين الذين سيتمّ دعوتهم لإجراء الاختبارات الكتابية والشفاهية بواسطة مكاتيب فردية.

COOPERATION

24-06-2026 | STAKEHOLDER PARTICIPATION PLAN (P3P) FOR THE MONASTIR NORTH WASTEWATER TREATMENT PROJECT

Read more

Close [X]

STAKEHOLDER PARTICIPATION PLAN (P3P) FOR THE MONASTIR NORTH WASTEWATER TREATMENT PROJECT
STAKEHOLDER PARTICIPATION PLAN (P3P) FOR THE MONASTIR NORTH WASTEWATER TREATMENT PROJECT

24-06-2026 | ENVIRONMENTAL AND SOCIAL MANAGEMENT PLAN

Read more

24-06-2026 | ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT – DRAFT VERSION

Read more

Close [X]

Environmental and Social Impact Assessment of the new Wastewater Treatment Plant in Monastir North – DRAFT VERSION
Environmental and Social Impact Assessment of the new Wastewater Treatment Plant in Monastir North – DRAFT VERSION

08-11-2023 | Treated Waste Water Quality Improvement Project II

Read more

Close [X]

Within the frame work of the final evaluation mission carried out by African Development Bank (BAD) delegation ; October 9 to 16, 2023 concerning the treated wastewater quality improvement project II, which includes 19 sanitation stations (Menzel Temim and AFH in Nabeul, Sliman, Zaghouan, ezriba, Fernana, Ghar dima, Bou Salem, Tboursok, Testour, Nefza and Sbeitla Kasserine, Jelma, Agreb, Metlaoui, Tozeur, Kébili and Lella Meryem; a working session was held Friday morning October 20, 2023, to sign the minutes of project which will be financed by the bank through a loan of 81.92 million euros to achieve works rehabilitation and extension of 19 wastewater treatment plants.

This project comprises 13 wastewater treatment plants will be equipped with tertiary treatment systems and photovoltaic solar energy, the acquisition of equipment for maintenance, operation and capacity building.

It aims to:

  • - Contribute to the national effort to mobilize non-conventional water resources to climate changer adaptation
  • - Ensure the production of treated waste water conforming to Tunisian specifications for its reuse in the agricultural fields (NT106-03);
  • - Ensure the stability of better quality of the waste water treated.
  • - Improve the energy efficiency and guarantee the performance of treatment.

Completion period 2024-2028

13-05-2022 | ABD and EBRD monitoring mission
ABD and EBRD monitoring mission
Read more

Close [X]

13may 2022

ABD and EBRD monitoring mission

A meeting session has been held on Friday 13 may 2022 under the supervision of the Chief Executive Officer of the National Sanitation Utility ONAS with the presence of delegation from African Bank for Development ABD and the European bank for reconstruction and development EBRD ,the closing meeting for the monitoring mission with representatives from the mentioned banks from 09 to 13 may 2022¸ for the sanitation program of small towns less than 10.000 inhabitants (phase n1) and the issue raised along this session was the progress of different parts of the projects.

The issue raised on the progress of the project which includes rehabilitation and extension of 5 WWT plants in Beja Mjez elbeb Jendouba Tabarka and Siliana, lying and rehabilitation of about 700 km of connection sewers in 35 municipalities in that states involved in the project, building and rehabilitation of 43 pumping stations and acquisition of operation and maintenance equipments of wastewater network.

18-03-2022 | Sanitation of Bni Mtir
Sanitation of Bni Mtir
Read more

Close [X]

18 march 2022 s

Sanitation of Bni Mtir

Within the framework of the program of sanitation of towns under 10.000 inhabitants financed by the African Bank for Development ABD and the European bank for reconstruction and development EBRD ,the National Sanitation Utility ONAS has organised an information day on 18 march 2022 concerning the sanitation of the region Bni Mtir in Jendouba¸with the presence of representatives from municipalities of Bni Mtir, environmental associations and civil society as well the presence of study ‘ office responsible for this study where it was presented the study progress as well the environmental and social parts of the project.

17-03-2022 | Energy efficiency
Energy efficiency
Read more

Close [X]

17 march 2022

Energy efficiency

The National Sanitation Utility ONAS has organised on Wednesday 17 march 2022 along the energy efficiency program financed by the German bank for development KFW ¸an information day on the project of rehabilitation and extension of WWT plant in korba with the presence of representatives from environmental associations in korba and regional representatives from agricultural development delegation and environmental protection agency and coastline protection agency as well as the presence of study ‘ offices ‘ group responsible for this program where it was presented the study progress especially the raise of the waste water treatment plant’ capacity ¸ the development of water quality the use of equipment for energy efficiency.

Moreover it was presented the results of the study which concerns hydraulic characteristic of sabkha area which is prepared according to the valorisation program of treated water in humid areas as well as its reuse in agricultural field and ground water recharge .

22-05-2026 | Completion of the Khlidia wastewater treatment plant works

As part of the Small Town Sanitation Program, the municipality of El Khalidia hosted, on May 13, 2026, a significant technical visit during which the completion of an integrated sanitation system and the launch of the operational phase of the wastewater treatment plant were announced. The plant has a treatment capacity of 2,427 m³/day and is equipped with a tertiary treatment unit for the reuse of treated wastewater.


Read more

Close [X]

As part of the Small Town Sanitation Program, the municipality of El Khalidia hosted, on May 13, 2026, a significant technical visit during which the completion of an integrated sanitation system and the launch of the operational phase of the wastewater treatment plant were announced. The plant has a treatment capacity of 2,427 m³/day and is equipped with a tertiary treatment unit for the reuse of treated wastewater.
The project also includes:

  • 33 kilometers of sewerage networks,
  • 5 pumping stations,
  • as well as the connection of around 1,800 homes to the network.
The total cost of the project amounts to 45 million Tunisian dinars, financed by the Republic of Tunisia, the African Development Bank, and the European Bank for Reconstruction and Development. The visit was attended by Ms. Malinne Blomberg, Vice President for North Africa at the African Development Bank, representatives of the European Bank for Reconstruction and Development, and Mr. Abdelmajid Battayeb, Chief Executive Officer of the National Sanitation Office.
This project is not limited to improving health and environmental conditions; it also opens broad prospects for economic development through agricultural irrigation, the establishment of industrial zones, and the promotion of eco-tourism.

 

10-06-2023 | A financing agreement between the republic of Tunisia and the bank

Read more

Close [X]

The minister of economy and planning, M.Samir Saied, and the resident representative of the world bank in Tunisia, M. Alexandre Arrobbio, signed on Friday june, 2 2023 at the headquarters of the ministry, a financing agreement between the republic of Tunisia and the bank for amount of 113.6 million euros , or about 377.6 million dinars.

This agreement was signed for the benefit of the National Office for Sanitation (ONAS) for the financing of a support project for the operation of a number of treatment facilities in northern Tunisia, namely the governorates of Tunis and Ariana, and in the South in the governorates of Sfax, Gabes, Medenine and Tataouine.

The total cost of this project is about 1.746 million dinars, and it will be implemented over 10 years.

The international bank for reconstruction and development (IBRD) contributes to the realization of this project by financing the work necessary for the rehabilitation and renewal of equipment in the treatment and pumping stations, as well as the support of ONAS in the implementation of the project and capacity building.

08-11-2023 | KFW cooperation

Read more

Close [X]

ONAS signed on Tuesday, October 31, 2023, at the headquarters of the Ministry of Foreign Affairs, Immigration and Tunisians Abroad, a financing agreement at the amount of 26 million euros with the German Development Bank (KFW) within the framework of debt recycling, 11 million euros were allocated to the National Sanitation Utility to finance the second phase of the sanitation program for 10 and medium-sized cities and 15 million euros for the benefit of the National Water Exploitation and Distribution utility to finance the second phase of the national improvement water quality in the south of Tunisia.

28-04-2022 | The aquatic environment in the interior regions and the rehabilitation of wastewater facilities in 10 municipalities
The aquatic environment in the interior regions and the rehabilitation of wastewater facilities in 10 municipalities
Read more

Close [X]

Within the framework of improving the aquatic environment in the interior regions and the rehabilitation of wastewater facilities in 10 municipalities (Bizerte, Zaghouan, Beja ,Siliana Kef, Jendouba, Kasserine, Sidi bouzid , Kebilli and Sfax , financed by the Japanese Agency for International Cooperation JICA and on the occasion of the launch of Siliana WWTP extension and rehabilitation works , a working session has been organised under the supervision of Mrs Leila Chikhaoui , the Minister of Environment on Friday 15 April 2020 at the Ministry’s headquarters with the presence of his Excellency the Japanese Ambassador, Mr shimzu shinsuke and the Director of the Japanese Agency for International Cooperation’ office in Tunisia, Mr ueno shuhei and Mr abdelmajid bettaieb ONAS National Sanitation Utility CEO.

The issue raised on the progress of the project which includes rehabilitation and extension of 5 WWT plants in Beja Medjez elbeb, Jendouba, Tabarka and Siliana, lying and rehabilitation of about 700 km of connection sewers in 35 municipalities in that states involved in the project, building and rehabilitation of 43 pumping stations and acquisition of operation and maintenance equipments of wastewater network.

22-06-2026 | Environmental and Social Management System

Read more

Close [X]

Environmental and Social Management System – Collective Sanitation Concession – Lot 1: North
Environmental and Social Management System – Collective Sanitation Concession – Lot 1: North

22-06-2026 | Environmental and Social Management Plan

Read more

22-06-2026 | Worker Management Plan

Read more

Close [X]

Worker Management Plan – Collective Sanitation Concession – Lot 1: North
Worker Management Plan – Collective Sanitation Concession – Lot 1: North

03-12-2025 | Circular Note No. 9 (in French)

Read more

31-10-2025 | Circular Note No. 8: Call for Tenders for the Conclusion of a Partnership Contract for the Design, Construction, Financing, Operation, Maintenance, and Upkeep of the TUNIS NORTH Wastewater Treatment Plant in El Hessiane, as well as the Maintenance and Management of the Related Facilities.

Read more

01-09-2025 | Circular Note No. 7: Call for tenders for the conclusion of a Partnership Agreement for the Design, Construction, Financing, Operation, Upkeep and Maintenance of the TUNIS NORD Wastewater Treatment Plant in El Hessiane and the Upkeep, Maintenance and Management of Ancillary Facilities.

Read more

20-05-2025 | Hesiane Circular Note No. 6

Read more

22-06-2026 | Stakeholder Engagement Plan

Read more

Close [X]

Stakeholder Engagement Plan – Collective Sanitation Concession – Lot 1: North Tunis
Stakeholder Engagement Plan – Collective Sanitation Concession – Lot 1: North Tunis

DEPOLMED

22-07-2025 | Monitoring the Implementation of the DEPOLMED Program: Technical Workshops for Evaluation and Progress Review
The National Sanitation Office (ONAS) organized a series of technical workshops on June 23, 24, and 25, 2025, as part of the ongoing monitoring of the Depolmed program.
Read more

Close [X]

The National Sanitation Office (ONAS) organized a series of technical workshops on June 23, 24, and 25, 2025, as part of the ongoing monitoring of the Depolmed program.

 The events gathered representatives from the public sector, civil society organizations, environmental experts, and communication specialists. These workshops aimed to: assess the progress of the program; evaluate its positive environmental impacts; discuss technical and operational aspects of implementation; with the goal of ensuring its successful completion under optimal conditions. 

The program is co-financed by: the French Development Agency (AFD): €60 million; the European Investment Bank (EIB): €69.6 million; the European Union (EU): €10.4 million in the form of a grant; bringing the total funding to approximately €140 million. 

This funding is invested in structural projects that include: upgrading and expanding coastal wastewater treatment plants; rehabilitating networks and pumping stations; improving operational and maintenance capacities within ONAS structures; implementing a national and regional communication plan to promote environmental citizenship. 

The first phase of the program began in 2018 and will run through 2028. Interventions have reached 13 governorates—mostly coastal—with a completion rate of approximately 60%.

Suivi de la mise en œuvre du programme DEPOLMED : Ateliers techniques d’évaluation et  de revue des progrès


Suivi de la mise en œuvre du programme DEPOLMED : Ateliers techniques d’évaluation et  de revue des progrès


Suivi de la mise en œuvre du programme DEPOLMED : Ateliers techniques d’évaluation et  de revue des progrès


Suivi de la mise en œuvre du programme DEPOLMED : Ateliers techniques d’évaluation et  de revue des progrès


Suivi de la mise en œuvre du programme DEPOLMED : Ateliers techniques d’évaluation et  de revue des progrès


Suivi de la mise en œuvre du programme DEPOLMED : Ateliers techniques d’évaluation et  de revue des progrès


24-02-2023 | Monitoring mission of the environmental and social aspect of the projects

Within the framework of cooperation with the French Development Agency (AFD), a mission of the environmental and social monitoring support division (AFD Headquarters - France) was carried out in Tunisia from 15 to 17 February 2023


Read more

Close [X]

Within the framework of cooperation with the French Development Agency (AFD), a mission of the environmental and social monitoring support division (AFD Headquarters - France) was carried out in Tunisia from 15 to 17 February 2023. This mission was supported by the AFD office in Tunis.


This mission comes in support of ONAS for the environmental and social components for the projects financed by AFD in particular:
- The PAR 4 (Rural Sanitation Program - Tranche 4 financed by AFD) which consists in the sanitation of 36 rural localities, spread over 13 governorates, for the benefit of a total population of about 131 000 inhabitants.
- DEPOLMED (Program contributing to the Depollution of the Mediterranean co-financed by AFD, EIB and EU) which consists in the upgrading of 4 STEP: Sud méliane, Sousse Hamdoun 2, Kélibia and Jedaida as well as the extension and rehabilitation of sewerage networks in 13 governorates.


During this mission, it was carried out the :

- Review of the environmental and social aspects of the two programs: PAR4 and DEPOLMED.
- A visit to the South Melian WWTP whose extension project is underway within the framework of the "DEPOLMED" program.
- A training on the Principles of Environmental and Social Risk Management (MRESO) for projects financed by AFD, accompanied by a field visit (practical case) of the locality of Oued Zarga - Governorate of Beja whose sanitation works are planned at the level of PAR4.








30-09-2020 | AFD new director visits The Southern Meliane WWTP
Mr. Yazid Safi, the new director of the AFD accompanied by Mr. Louis Racine, chief of staff of his Excellency the French Ambassador, as well as representatives of the AFD Tunisia and executives of ONAS
Read more

Close [X]

Mr. Yazid Safi, the new director of the AFD accompanied by Mr. Louis Racine, chief of staff of his Excellency the French Ambassador, as well as representatives of the AFD Tunisia and executives of ONAS, made a field visit to the Souther Meliane wastewater treatment plant located in the governorate of Ben Arous whose rehabilitation and extension work will begin during the month of October 2020. 


The cost of this project is estimated at 136 million dinars. 


This project will adopt tertiary treatment as well as odor treatment in order to reduce the harmful impacts that the region is witnessing within the framework of the DEPOLMED project.





25-11-2020 | The official start of rehabilitation and extension works – WWWTP southern Meliane

Read more

Concession Project

PUBLIC-PRIVATE PARTNERSHIP FOR THE OPERATION OF WASTEWATER FACILITIES

Read more

30-09-2022 | Notice of the results of the consultation N ° 001/2019 5 Concession project for the Tunis North and South Tunisian lots

Read more

25-06-2020 | The notice of international interest of engineering offices
relating to: "Mission of assistance and support for the management of concession contracts"
Read more

22-08-2023 | Mission d'un Consultant technique pour la sauvegarde environnementale et sociale pour le lot2 Sud de la Tunisie du projet de concession
Mission d'un Consultant technique pour la sauvegarde environnementale et sociale pour le lot2 Sud de la Tunisie du projet de concession
Read more

22-08-2023 | Mission d'un auditeur pour la sauvegarde environnementale et sociale du projet de concession
Mission d'un auditeur pour la sauvegarde environnementale et sociale du projet de concession
Read more

PUBLIC-PRIVATE PARTNERSHIP FOR THE OPERATION OF WASTEWATER FACILITIES

Read more

Close [X]

In order to establish a dynamic of modernization in the sanitation sector in the country, the Tunisian government instructed the ONAS to develop a publicprivate partnership (PPP) through regional PPP contracts....

Download the PDF

New Infrastructures

List of agreements

Read more

Close [X]

Within the framework of Wastewater treatment plants renovation & upgrading programme, a Co-financing Agreement was signed between The National Sanitation Utility “ONAS” , the German Development Bank “KFW” , The French Development Agency (AFD) and The European Commission. The agreement includes :

  • - 54.974 Million EURO loan from the German Development Bank.
  • 18.5 Million EURO loan from the French Development Agency
  • 8 million EURO grant from The European Community.

This project of extension and rehabilitation due to be implemented under the mechanism of the Neighbourhood Investment Facility (NIF).


Attached files :


File Description Size
 list of agreements    120 ko

Study and Assessment Report

Read more

Memorandum of understanding between ONAS, ANPE and CITET

Read more

Close [X]

 

Within the framework of 9 industrial zones sanitation program financed by The German Development Bank KfW, and as previous actions to be implemented during the program, a memorandum of understanding was signed between ONAS, ANPE and CITET in order to define every organization tasks and ensure better coordination.


Fichiers joints :


Fichier Descriptif Taille
Memorandum of understanding between ONAS, ANPE and CITET    1463 ko